Wednesday, 18 November 2009

Diploma Unit 3: Team Spaghetti Bridges

Ben Carrington was our leader, but he was not giving enough information to us and thus, a lot of people then decided to not do anything, at the start, he gave out jobs to everyone:

  • Gary, Chris, Tom – Research
  • Will, Liam, Loretta, Emily – Design
  • Tim, Ryan, Tyler, Ben, Will – Construction
  • Tyler – Cleaner
  • Tyler, (Ben) – Team Motivator

These jobs did not last though, for most jobs were being switched every few minutes, and it all went wrong when we tested the bridge, and it ended up less strong than the previous design. Even the presentation made for this group was completely ignored.

Once the half-way point of the allotted time to design/construct had come, Ben rounded up all of the constructors and then there was nothing for anyone else to do,